Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Obstruction lighting during wind farm construction

By Paul Dvorak | May 18, 2017

This article comes from Flash Technology, In News, Wind, May 16, 2017

Ensure your wind turbines comply with federal lighting regulations by adhering to these three FAA requirements (described in this article)  for lighting wind farm construction sites.

Ensure your wind turbines comply with federal lighting regulations by adhering to these three FAA requirements for lighting wind farm construction sites.

  1. You cannot use a Notice to Airmen (NOTAM) to justify leaving turbines unlit at night.
    Once turbines reach a height of 200 feet (61 meters) during construction, an FAA L-810 red light must be used. If power is not available, use a self-contained, solar-powered, steady-burning red LED light that meets the photometric requirements of an L-810 lighting system. The advisory circular clearly states that “using a NOTAM to justify not lighting the turbines until the entire project is completed is prohibited.”
    Source: FAA ac 70/7460-1L Section 13.8

  2. FAA L-810 lights must have a minimum intensity of 32.5 candelas at their peak.
    The center of the vertical beam spread must be between +4 and +20 degrees. The vertical beam spread must be at least 10 degrees. The intensity at the highest and lowest angles of the beam spread must be at least 16.25 candela.
    Source: FAA ac 150/5345-43H

  3. Temporary solar lighting systems must have seven (7) days of autonomy and 32.5 candelas.
    Autonomy refers to how long the light will last if all solar charging is removed. Autonomy refers to how long the light will last if all solar charging is removed. A light with seven days of autonomy should shine for seven consecutive nights if there is no sunlight or charging during those days.
    Source: FAA Engineering Brief 76

Well suited for MET towers and wind farm construction, the OL800 solar obstruction light complies with FAA L-810 and ICAO low-intensity type A and type B requirements.

And within the next two months, the FAA should finalize HR 636, including further definition on what structures between 50’ and 200’ need to be lit. We will share information as it becomes available.

OL800 SOLAR LIGHT

Ideal for MET towers and wind farm construction, the OL800 solar obstruction light complies with FAA L-810 and ICAO low-intensity type A and type B requirements. It is self-contained, easy to install and exceeds 32.5 candelas for at least seven days. It also requires minimal maintenance.
Stop by booth 3609 at AWEA WINDPOWER 2017 or contact sales for an in-person demo.


Filed Under: Construction, News, Obstruction lighting, Safety
Tagged With: Flash Technology
 

About The Author

Paul Dvorak

Related Articles Read More >

Wind turbine lighting
Minnesota lawmaker proposes mandate for wind-turbine lighting systems
Phoenix Contact Lightning Monitoring System (LM-S) use sensors based on the Faraday Effect to provide a more comprehensive range of lightning data to manage assets. Polarized light is rotated through a magnetic field over a defined length and measured. When mounted on a turbine blade’s down conductor, an external magnetic field is generated by the lightning current, which travels down the conductor and rotates a light beam proportional to the current amplitude. The LM-S lightning current measuring system can detect, evaluate, and remotely monitor lightning strikes in real-time.
Preparing turbines for lightning strikes
Technostrobe partners to provide new offshore wind lighting solutions
SVC Light
ABB wins $30 million order to support integration of offshore wind energy in the UK

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe